System Testing, Deployments, and UpgradesΒΆ
- Testing A CSC At The Summit
- Control System Upgrade
- Upgrading the Interface (XML)
- Incremental Upgrades to the Interface (XML)
- Upgrading SAL
- Upgrading Kafka
- Setting a Schedule for a full Cycle upgrade
- Preparing for Deployment
- Deployment Configuration Repositories
- Deployment Helper Repositories
- Site Specific Variations
- Deploying the Upgrade
- Deploying an Incremental Upgrade
- Site Specific Variations
- Camera Control System Upgrade
- Managing User Authorization
- TSSW Build Procedures
- User Authorization