Skip to main content
Ctrl+K

Controls Documentation

  • Control System Architecture
  • Writing SAL Scripts
  • Writing JSON BLOCK Files
  • Engineering Facilities Database
  • XML Unit Standards
    • System Testing, Deployments, and Upgrades
    • Troubleshooting
    • Project Documentation Information
    • Rubin docs
  • GitHub
  • Control System Architecture
  • Writing SAL Scripts
  • Writing JSON BLOCK Files
  • Engineering Facilities Database
  • XML Unit Standards
  • System Testing, Deployments, and Upgrades
  • Troubleshooting
  • Project Documentation Information
  • Rubin docs
  • GitHub

Section Navigation

  • Control System Upgrade
    • Upgrading the Interface (XML)
    • Preparing for Deployment
    • Deploying the Upgrade
    • Upgrade Checklist
    • Camera Control System Upgrade
  • Managing User Authorization
  • TSSW Build Procedures
    • TSSW Build System
  • SSW Testing Procedures
    • Setting up a playlist for testing in BTS
    • Testing A CSC At The Summit
  • User Authorization
  • System Testing, Deployments, and Upgrades
  • SSW Testing Procedures

SSW Testing Procedures#

This section covers various procedures related to testing Control System components both at the Summit and Test Stands.

  • Setting up a playlist for testing in BTS
  • Testing A CSC At The Summit

previous

TSSW Build System

next

Setting up a playlist for testing in BTS

Edit on GitHub

© Copyright 2020-2026 Association of Universities for Research in Astronomy, Inc. (AURA).

Created using Sphinx 8.1.3.

Built with the PyData Sphinx Theme 0.16.1.